Warning: mkdir(): No space left on device in /www/wwwroot/Z8.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/gyzljc.com/cache/ad/f5a56/fe3f1.html): failed to open stream: No such file or directory in /www/wwwroot/Z8.COM/func.php on line 115
HENGTONG GROUP CO.,LTD.




小猪视频下载官网APP,小猪视频IOS下载安装无限,小猪视频黄色网站,小猪猪在线观看免费视频

News

News

Home| News| News

Hengtong Cable Australia 1,000,000m Milestone

2019-10-29 1735 Font size:

Hengtong Cable Australia (HCA) has achieved a milestone of 1,000,000 meters of MV Cable ordered since its establishment in October of 2017. This is the supply of 3.3kV up to and including 33kV.

 

Hengtong Cable Australia’s General Manager, Steven Whitehead has stated, “This is a great achievement for both HCA as well as the Hengtong Group and is due to the dedication and hard work of our staff. We have built some very strong relationships with clients and of course without them, nothing is possible and would like to say a big thank you to them”.

HCA has built a strong presence in the renewable sector in Australia supplying multiple Wind and Solar Farm Projects and being one of the only cable manufacturers present in Australia, who can supply all cable and wires types from its own facilities of which none are OEM.



网站地图